CHG0040005

Summary
Number:CHG0040005Approval:Approved
Type:StandardState:Scheduled
Category:OtherConfiguration item: 
Impact:3 - LowPhase:Requested
Urgency:3 - LowRisk:Moderate
Priority:4 - LowClosed at: 
Short description:Add network switch to cabinet
Reason: 
Parties & Schedule
Assigned to: 
Start date: 
End date: 

Description

This standard change template describes adding a new network switch to a datacenter cabinet

Change Plans

Backout Plan

-- Physically remove switch and all associated cabling
-- Remove switch from management, monitoring and ServiceNow CMDB

Test Plan

-- Run connectivity tests by connecting laptop to copper interface
-- Ensure that switch is showing as healthy in network monitoring console

Implementation Plan

-- Physically rack switch in top of cabinet
-- Ensure that redundant power supply is connected to the backup power circuit in the cabinet
-- Ensure that first GBIC fibre connector (Gi0/1) connects to primary distribution switch
-- Ensure that second GBIC fibre connector (Gi1/1) connects to secondary distribution switch
-- Connect console port to cabinet management console
-- Add switch to network management console
-- Add switch to network monitoring console
-- Add switch to ServiceNow CMDB


Click for Variables

parent
reason
watch_list
upon_reject
cancel
sys_updated_on
2016-08-10 16:16:52
type
standard
approval_history
number
CHG0040005
test_plan
-- Run connectivity tests by connecting laptop to copper interface\n-- Ensure that switch is showing as healthy in network monitoring console
cab_delegate
requested_by_date
state
-2
sys_created_by
admin
knowledge
false
order
phase
requested
cmdb_ci
delivery_plan
contract
impact
3
active
true
work_notes_list
priority
4
sys_domain_path
/
cab_recommendation
production_system
false
review_date
business_duration
group_list
requested_by
System Administrator
my_requested_by
System Administrator
my_requested_by_link
SysUser.6816f79cc0a8016401c5a33be04be441
change_plan
approval_set
implementation_plan
-- Physically rack switch in top of cabinet\n-- Ensure that redundant power supply is connected to the backup power circuit in the cabinet\n-- Ensure that first GBIC fibre connector (Gi0/1) connects to primary distribution switch\n-- Ensure that second GBIC fibre connector (Gi1/1) connects to secondary distribution switch\n-- Connect console port to cabinet management console\n-- Add switch to network management console\n-- Add switch to network monitoring console\n-- Add switch to ServiceNow CMDB\n
end_date
short_description
Add network switch to cabinet
correlation_display
delivery_task
work_start
additional_assignee_list
outside_maintenance_schedule
false
std_change_producer_version
A08e02ec47410200e90d87e8dee4905a?
my_std_change_producer_version_link
StdChangeProducerVersion.A08e02ec47410200e90d87e8dee4905a
service_offering
sys_class_name
change_request
closed_by
follow_up
reassignment_count
1
review_status
assigned_to
start_date
sla_due
comments_and_work_notes
escalation
0
upon_approval
proceed
correlation_id
made_sla
true
backout_plan
-- Physically remove switch and all associated cabling\n-- Remove switch from management, monitoring and ServiceNow CMDB
conflict_status
Not Run
sys_updated_by
admin
opened_by
System Administrator
my_opened_by
System Administrator
my_opened_by_link
SysUser.6816f79cc0a8016401c5a33be04be441
user_input
sys_created_on
2016-08-10 16:16:31
on_hold_task
closed_at
review_comments
business_service
time_worked
expected_start
opened_at
2016-08-10 16:16:31
work_end
phase_state
open
cab_date
work_notes
close_code
assignment_group
CAB Approval
my_assignment_group
CAB Approval
my_assignment_group_link
SysUserGroup.B85d44954a3623120004689b2d5dd60a
description
This standard change template describes adding a new network switch to a datacenter cabinet
on_hold_reason
calendar_duration
close_notes
sys_id
1c87925347c12200e0ef563dbb9a7177
contact_type
cab_required
false
urgency
3
scope
3
company
justification
activity_due
comments
approval
approved
due_date
sys_mod_count
1
on_hold
false
sys_tags
conflict_last_run
unauthorized
false
location
risk
3
category
Other
risk_impact_analysis
my_sys_class_name_link
ChangeRequest.1c87925347c12200e0ef563dbb9a7177

Change Tasks