CHG0040006
| Summary | |||
|---|---|---|---|
| Number: | CHG0040006 | Approval: | Approved | 
| Type: | Standard | State: | Scheduled | 
| Category: | Other | Configuration item: | |
| Impact: | 3 - Low | Phase: | Requested | 
| Urgency: | 3 - Low | Risk: | Moderate | 
| Priority: | 4 - Low | Closed at: | |
| Short description: | Add network switch to cabinet | ||
| Reason: | |||
| Parties & Schedule | |||
| Assigned to: | |||
| Start date: | |||
| End date: | |||
Description
This standard change template describes adding a new network switch to a datacenter cabinet
Change Plans
Backout Plan
-- Physically remove switch and all associated cabling
-- Remove switch from management, monitoring and ServiceNow CMDB
Test Plan
-- Run connectivity tests by connecting laptop to copper interface
-- Ensure that switch is showing as healthy in network monitoring console
Implementation Plan
-- Physically rack switch in top of cabinet
-- Ensure that redundant power supply is connected to the backup power circuit in the cabinet
-- Ensure that first GBIC fibre connector (Gi0/1) connects to primary distribution switch
-- Ensure that second GBIC fibre connector (Gi1/1) connects to secondary distribution switch
-- Connect console port to cabinet management console
-- Add switch to network management console
-- Add switch to network monitoring console
-- Add switch to ServiceNow CMDB
- parent
 - reason
 - watch_list
 - upon_reject
 - cancel
 - sys_updated_on
 - 2016-08-10 16:35:59
 - type
 - standard
 - approval_history
 - number
 - CHG0040006
 - test_plan
 - -- Run connectivity tests by connecting laptop to copper interface\n-- Ensure that switch is showing as healthy in network monitoring console
 - cab_delegate
 - requested_by_date
 - state
 - -2
 - sys_created_by
 - admin
 - knowledge
 - false
 - order
 - phase
 - requested
 - cmdb_ci
 - delivery_plan
 - contract
 - impact
 - 3
 - active
 - true
 - work_notes_list
 - priority
 - 4
 - sys_domain_path
 - /
 - cab_recommendation
 - production_system
 - false
 - review_date
 - business_duration
 - group_list
 - requested_by
 - System Administrator
 - my_requested_by
 - System Administrator
 - my_requested_by_link
 - SysUser.6816f79cc0a8016401c5a33be04be441
 - change_plan
 - approval_set
 - implementation_plan
 - -- Physically rack switch in top of cabinet\n-- Ensure that redundant power supply is connected to the backup power circuit in the cabinet\n-- Ensure that first GBIC fibre connector (Gi0/1) connects to primary distribution switch\n-- Ensure that second GBIC fibre connector (Gi1/1) connects to secondary distribution switch\n-- Connect console port to cabinet management console\n-- Add switch to network management console\n-- Add switch to network monitoring console\n-- Add switch to ServiceNow CMDB\n
 - end_date
 - short_description
 - Add network switch to cabinet
 - correlation_display
 - delivery_task
 - work_start
 - additional_assignee_list
 - outside_maintenance_schedule
 - false
 - std_change_producer_version
 - A08e02ec47410200e90d87e8dee4905a?
 - my_std_change_producer_version_link
 - StdChangeProducerVersion.A08e02ec47410200e90d87e8dee4905a
 - service_offering
 - sys_class_name
 - change_request
 - closed_by
 - follow_up
 - reassignment_count
 - 1
 - review_status
 - assigned_to
 - start_date
 - sla_due
 - comments_and_work_notes
 - escalation
 - 0
 - upon_approval
 - proceed
 - correlation_id
 - made_sla
 - true
 - backout_plan
 - -- Physically remove switch and all associated cabling\n-- Remove switch from management, monitoring and ServiceNow CMDB
 - conflict_status
 - Not Run
 - sys_updated_by
 - admin
 - opened_by
 - System Administrator
 - my_opened_by
 - System Administrator
 - my_opened_by_link
 - SysUser.6816f79cc0a8016401c5a33be04be441
 - user_input
 - sys_created_on
 - 2016-08-10 16:35:23
 - on_hold_task
 - closed_at
 - review_comments
 - business_service
 - time_worked
 - expected_start
 - opened_at
 - 2016-08-10 16:35:23
 - work_end
 - phase_state
 - open
 - cab_date
 - work_notes
 - close_code
 - assignment_group
 - CAB Approval
 - my_assignment_group
 - CAB Approval
 - my_assignment_group_link
 - SysUserGroup.B85d44954a3623120004689b2d5dd60a
 - description
 - This standard change template describes adding a new network switch to a datacenter cabinet
 - on_hold_reason
 - calendar_duration
 - close_notes
 - sys_id
 - b0dbda5347c12200e0ef563dbb9a718f
 - contact_type
 - cab_required
 - false
 - urgency
 - 3
 - scope
 - 3
 - company
 - justification
 - activity_due
 - comments
 - approval
 - approved
 - due_date
 - sys_mod_count
 - 1
 - on_hold
 - false
 - sys_tags
 - conflict_last_run
 - unauthorized
 - false
 - location
 - risk
 - 3
 - category
 - Other
 - risk_impact_analysis
 - my_sys_class_name_link
 - ChangeRequest.B0dbda5347c12200e0ef563dbb9a718f
 