CHG0040006
Summary | |||
---|---|---|---|
Number: | CHG0040006 | Approval: | Approved |
Type: | Standard | State: | Scheduled |
Category: | Other | Configuration item: | |
Impact: | 3 - Low | Phase: | Requested |
Urgency: | 3 - Low | Risk: | Moderate |
Priority: | 4 - Low | Closed at: | |
Short description: | Add network switch to cabinet | ||
Reason: | |||
Parties & Schedule | |||
Assigned to: | |||
Start date: | |||
End date: |
Description
This standard change template describes adding a new network switch to a datacenter cabinet
Change Plans
Backout Plan
-- Physically remove switch and all associated cabling
-- Remove switch from management, monitoring and ServiceNow CMDB
Test Plan
-- Run connectivity tests by connecting laptop to copper interface
-- Ensure that switch is showing as healthy in network monitoring console
Implementation Plan
-- Physically rack switch in top of cabinet
-- Ensure that redundant power supply is connected to the backup power circuit in the cabinet
-- Ensure that first GBIC fibre connector (Gi0/1) connects to primary distribution switch
-- Ensure that second GBIC fibre connector (Gi1/1) connects to secondary distribution switch
-- Connect console port to cabinet management console
-- Add switch to network management console
-- Add switch to network monitoring console
-- Add switch to ServiceNow CMDB
- parent
- reason
- watch_list
- upon_reject
- cancel
- sys_updated_on
- 2016-08-10 16:35:59
- type
- standard
- approval_history
- number
- CHG0040006
- test_plan
- -- Run connectivity tests by connecting laptop to copper interface\n-- Ensure that switch is showing as healthy in network monitoring console
- cab_delegate
- requested_by_date
- state
- -2
- sys_created_by
- admin
- knowledge
- false
- order
- phase
- requested
- cmdb_ci
- delivery_plan
- contract
- impact
- 3
- active
- true
- work_notes_list
- priority
- 4
- sys_domain_path
- /
- cab_recommendation
- production_system
- false
- review_date
- business_duration
- group_list
- requested_by
- System Administrator
- my_requested_by
- System Administrator
- my_requested_by_link
- SysUser.6816f79cc0a8016401c5a33be04be441
- change_plan
- approval_set
- implementation_plan
- -- Physically rack switch in top of cabinet\n-- Ensure that redundant power supply is connected to the backup power circuit in the cabinet\n-- Ensure that first GBIC fibre connector (Gi0/1) connects to primary distribution switch\n-- Ensure that second GBIC fibre connector (Gi1/1) connects to secondary distribution switch\n-- Connect console port to cabinet management console\n-- Add switch to network management console\n-- Add switch to network monitoring console\n-- Add switch to ServiceNow CMDB\n
- end_date
- short_description
- Add network switch to cabinet
- correlation_display
- delivery_task
- work_start
- additional_assignee_list
- outside_maintenance_schedule
- false
- std_change_producer_version
- A08e02ec47410200e90d87e8dee4905a?
- my_std_change_producer_version_link
- StdChangeProducerVersion.A08e02ec47410200e90d87e8dee4905a
- service_offering
- sys_class_name
- change_request
- closed_by
- follow_up
- reassignment_count
- 1
- review_status
- assigned_to
- start_date
- sla_due
- comments_and_work_notes
- escalation
- 0
- upon_approval
- proceed
- correlation_id
- made_sla
- true
- backout_plan
- -- Physically remove switch and all associated cabling\n-- Remove switch from management, monitoring and ServiceNow CMDB
- conflict_status
- Not Run
- sys_updated_by
- admin
- opened_by
- System Administrator
- my_opened_by
- System Administrator
- my_opened_by_link
- SysUser.6816f79cc0a8016401c5a33be04be441
- user_input
- sys_created_on
- 2016-08-10 16:35:23
- on_hold_task
- closed_at
- review_comments
- business_service
- time_worked
- expected_start
- opened_at
- 2016-08-10 16:35:23
- work_end
- phase_state
- open
- cab_date
- work_notes
- close_code
- assignment_group
- CAB Approval
- my_assignment_group
- CAB Approval
- my_assignment_group_link
- SysUserGroup.B85d44954a3623120004689b2d5dd60a
- description
- This standard change template describes adding a new network switch to a datacenter cabinet
- on_hold_reason
- calendar_duration
- close_notes
- sys_id
- b0dbda5347c12200e0ef563dbb9a718f
- contact_type
- cab_required
- false
- urgency
- 3
- scope
- 3
- company
- justification
- activity_due
- comments
- approval
- approved
- due_date
- sys_mod_count
- 1
- on_hold
- false
- sys_tags
- conflict_last_run
- unauthorized
- false
- location
- risk
- 3
- category
- Other
- risk_impact_analysis
- my_sys_class_name_link
- ChangeRequest.B0dbda5347c12200e0ef563dbb9a718f